IMAG0030So how bout that first day of fabrication eh? People on the mills and on the lathe. Getting that master cam done. Such swag. Much wow.  

On a more serious note, Bear Metal has made significant strides towards our goal of 2 robots in 31 days. The design team is perfecting the design as our fabrication team begins their arduous journey in the making of our robot. IMAG0025Both mills are up and running and the lathe as well.Our media team is doing as they always do. Our electronics team is perfecting their layout of the new electronics system on our current robot design.IMAG0029_BURST006 All in all we have accomplished a lot today and hopefully we will continue to work hard.

-Brett Hoffbuhr

 

Post a Comment

Your email address will not be published. Required fields are marked *

*